Skip to content

Refactor sdkv2 detailed diff tests #6106

Refactor sdkv2 detailed diff tests

Refactor sdkv2 detailed diff tests #6106

Triggered via pull request January 7, 2025 16:13
Status Failure
Total duration 3m 41s
Artifacts

ci.yml

on: pull_request
Test and Lint  /  lint
3m 28s
Test and Lint / lint
Ensure test assets build cleanly
1m 5s
Ensure test assets build cleanly
Matrix: Test and Lint / test
Fit to window
Zoom out
Zoom in

Annotations

27 errors and 2 warnings
Test and Lint / test (1.22.x, windows-latest, PULUMI_TF_BRIDGE_ACCURATE_BRIDGE_PREVIEW)
unable to create file pkg/tests/diff_test/testdata/TestSDKv2DetailedDiffSetNestedComputedBlock/block_with_nested_computed_and_nested_force_new_computed_specified_in_program/two_added_and_two_removed_shuffled,_with_duplicates.golden: Filename too long
Test and Lint / test (1.22.x, windows-latest, PULUMI_TF_BRIDGE_ACCURATE_BRIDGE_PREVIEW)
The process 'C:\Program Files\Git\bin\git.exe' failed with exit code 1
Test and Lint / test (1.22.x, windows-latest, DEFAULT)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Test and Lint / test (1.22.x, windows-latest, DEFAULT)
unable to create file pkg/tests/diff_test/testdata/TestSDKv2DetailedDiffSetNestedComputedBlock/block_with_nested_computed_and_nested_force_new_computed_specified_in_program/two_added_and_two_removed_shuffled,_with_duplicates.golden: Filename too long
Test and Lint / test (1.22.x, windows-latest, DEFAULT)
The process 'C:\Program Files\Git\bin\git.exe' failed with exit code 1
Test and Lint / test (1.23.x, windows-latest, DEFAULT)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Test and Lint / test (1.23.x, windows-latest, DEFAULT)
unable to create file pkg/tests/diff_test/testdata/TestSDKv2DetailedDiffSetNestedComputedBlock/block_with_nested_computed_and_nested_force_new_computed_specified_in_program/two_added_and_two_removed_shuffled,_with_duplicates.golden: Filename too long
Test and Lint / test (1.23.x, windows-latest, DEFAULT)
The process 'C:\Program Files\Git\bin\git.exe' failed with exit code 1
Test and Lint / test (1.23.x, macos-latest, DEFAULT)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Test and Lint / test (1.23.x, macos-latest, DEFAULT)
The operation was canceled.
Test and Lint / test (1.23.x, windows-latest, PULUMI_TF_BRIDGE_ACCURATE_BRIDGE_PREVIEW)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Test and Lint / test (1.23.x, windows-latest, PULUMI_TF_BRIDGE_ACCURATE_BRIDGE_PREVIEW)
unable to create file pkg/tests/diff_test/testdata/TestSDKv2DetailedDiffSetNestedComputedBlock/block_with_nested_computed_and_nested_force_new_computed_specified_in_program/two_added_and_two_removed_shuffled,_with_duplicates.golden: Filename too long
Test and Lint / test (1.23.x, macos-latest, PULUMI_TF_BRIDGE_ACCURATE_BRIDGE_PREVIEW)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Test and Lint / test (1.22.x, macos-latest, DEFAULT)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Test and Lint / test (1.22.x, macos-latest, DEFAULT)
The operation was canceled.
Test and Lint / test (1.23.x, ubuntu-latest, DEFAULT)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Test and Lint / test (1.23.x, ubuntu-latest, DEFAULT)
The operation was canceled.
Test and Lint / test (1.22.x, macos-latest, PULUMI_TF_BRIDGE_ACCURATE_BRIDGE_PREVIEW)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Test and Lint / test (1.22.x, ubuntu-latest, PULUMI_TF_BRIDGE_ACCURATE_BRIDGE_PREVIEW)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Test and Lint / test (1.22.x, ubuntu-latest, DEFAULT)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Test and Lint / test (1.22.x, ubuntu-latest, DEFAULT)
The operation was canceled.
Test and Lint / test (1.23.x, ubuntu-latest, PULUMI_TF_BRIDGE_ACCURATE_BRIDGE_PREVIEW)
The job was canceled because "_1_22_x_windows-latest_PU" failed.
Ensure test assets build cleanly
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Test and Lint / lint
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636