Skip to content

Add converter to smolagents tool #19

Add converter to smolagents tool

Add converter to smolagents tool #19

Triggered via pull request January 22, 2025 23:13
Status Failure
Total duration 4m 24s
Billable time 12m
Artifacts

ci.yml

on: pull_request
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Test (3.11)
Process completed with exit code 2.
Test (3.10)
Process completed with exit code 2.
Test (3.9)
The job was canceled because "_3_11" failed.
Test (3.9)
Process completed with exit code 2.
Test (3.8)
The job was canceled because "_3_11" failed.
Test (3.8)
Process completed with exit code 2.
Test (3.12)
The job was canceled because "_3_11" failed.
Test (3.12)
The operation was canceled.
Test (3.13)
The job was canceled because "_3_11" failed.
Test (3.13)
The operation was canceled.