Skip to content

update versions

update versions #999

Triggered via push November 2, 2023 16:35
Status Failure
Total duration 2m 25s
Artifacts

run-tests.yml

on: push
Matrix: deploy
Fit to window
Zoom out
Zoom in

Annotations

7 errors
deploy (3.8)
Process completed with exit code 1.
deploy (3.9)
The job was canceled because "_3_8" failed.
deploy (3.9)
The operation was canceled.
deploy (3.10)
The job was canceled because "_3_8" failed.
deploy (3.10)
The operation was canceled.
deploy (3.11)
The job was canceled because "_3_8" failed.
deploy (3.11)
The operation was canceled.