Skip to content

chore(tests): switch to playwright test runner #379

chore(tests): switch to playwright test runner

chore(tests): switch to playwright test runner #379

Re-run triggered September 4, 2024 23:32
Status Failure
Total duration 22s
Artifacts

pr-check.yaml

on: pull_request
Matrix: Test
e2e tests
0s
e2e tests
Matrix: Build
Waiting for pending jobs
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Test (macos-14)
Process completed with exit code 1.
Test (ubuntu-22.04)
The job was canceled because "macos-14" failed.
Test (ubuntu-22.04)
Input required and not supplied: path
Test (windows-2022)
The job was canceled because "macos-14" failed.
Test (windows-2022)
The operation was canceled.