tweaks for clarity (#2143) #1209
master.yml
on: push
build
/
lint
2m 17s
Matrix: build / test
Annotations
10 errors
build / test (1.21.x, ubuntu-latest)
Process completed with exit code 2.
|
build / test (1.22.x, macos-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
|
build / test (1.21.x, windows-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
|
build / test (1.21.x, windows-latest)
The operation was canceled.
|
build / test (1.21.x, macos-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
|
build / test (1.21.x, macos-latest)
The operation was canceled.
|
build / test (1.22.x, windows-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
|
build / test (1.22.x, windows-latest)
The operation was canceled.
|
build / test (1.22.x, ubuntu-latest)
The job was canceled because "_1_21_x_ubuntu-latest" failed.
|
build / test (1.22.x, ubuntu-latest)
The operation was canceled.
|