Skip to content

chore(deps): update codecov/codecov-action action to v5 #12

chore(deps): update codecov/codecov-action action to v5

chore(deps): update codecov/codecov-action action to v5 #12

Triggered via pull request January 6, 2025 17:11
Status Failure
Total duration 42s
Artifacts

test.yaml

on: pull_request
Matrix: lint
Matrix: pytest
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 3 warnings
lint (mypy)
Process completed with exit code 2.
lint (ruff check)
The job was canceled because "mypy" failed.
lint (ruff check)
Process completed with exit code 1.
pytest (3.12)
Process completed with exit code 1.
pytest (3.10)
The job was canceled because "_3_12" failed.
pytest (3.10)
Process completed with exit code 1.
pytest (3.8)
The job was canceled because "_3_12" failed.
pytest (3.8)
Process completed with exit code 1.
pytest (3.11)
The job was canceled because "_3_12" failed.
pytest (3.11)
Process completed with exit code 1.
pytest (3.9)
The job was canceled because "_3_12" failed.
pytest (3.9)
The operation was canceled.
pytest (3.13)
The job was canceled because "_3_12" failed.
pytest (3.13)
The operation was canceled.
lint (mypy)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
lint (ruff format --check)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
pytest (3.12)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636