Skip to content

FCS Run 22 Calender

dkapukchyan edited this page Mar 12, 2024 · 1 revision

Important Dates

  • 2021-12-25 (22359013) Main Triggers are prometed to production Id
  • 2022-02-17 (23048037) Ecal electronics gain changed, Production Id for all FCS triggers will change from next production run.
  • 2022-02-28 (23059042) Ecal electronics gain updated based on Feb27 LED data
  • 2022-03-07 (23066056) Ecal gain updated based on Mar06 LED data
  • 2022-03-14 (23073059) Ecal New LED2 voltage file
  • 2022-03-21 (23080057) Ecal New LED3 voltage file
  • 2022-03-28 (23087057) Ecal New LED4 voltage file
  • 2022-04-02 (23092036) EPD Splitter power is down (No Ele triggers)
  • 2022-04-03 (23093050) First production run after EPD Splitter power is fixed
  • 2022-04-04 (23094050) Ecal New LED5 voltage file
  • 2022-04-11 (23101043) Ecal New LED6 voltage file

Run number in parenthesis indicates the start of the period. End of the period is indicated by the start of the next period

  • Period 0 : 12/25 (22359013): No Ecal Gains for this period
  • Period 1 : 01/05 (23005043): Ecal Gains Only
  • Period 2 : 02/17 (23048036): Ecal Gains Only
  • Period 3 : 03/07 (23066056): Ecal Gains Only
  • Period 4 : 03/14 (23073059): Ecal Gains Only
  • Period 5 : 03/21 (23080057): Ecal Gains Only
  • Period 6 : 03/28 (23087057): Ecal Gains Only
  • Period 7 : 04/04 (23094050): Ecal Gains Only
  • Period 8 : 04/11 (23101043): Ecal Gains Only