Skip to content

Commit

Permalink
Refresh data 2024-10-17
Browse files Browse the repository at this point in the history
  • Loading branch information
ivansabik committed Oct 17, 2024
1 parent 2afb793 commit 0775039
Show file tree
Hide file tree
Showing 519 changed files with 3,153,097 additions and 150 deletions.
6,050 changes: 6,050 additions & 0 deletions data/-386_KWwTbs.json

Large diffs are not rendered by default.

14,945 changes: 14,945 additions & 0 deletions data/-JsAv3O8Erg.json

Large diffs are not rendered by default.

14,970 changes: 14,970 additions & 0 deletions data/-f22aDv09Sw.json

Large diffs are not rendered by default.

13,115 changes: 13,115 additions & 0 deletions data/-pcgjOCO3ow.json

Large diffs are not rendered by default.

70 changes: 70 additions & 0 deletions data/-tY3NnXpI7w.json
Original file line number Diff line number Diff line change
@@ -0,0 +1,70 @@
{
"video_id": "-tY3NnXpI7w",
"video_thumbnail_url": "https://i.ytimg.com/vi/-tY3NnXpI7w/hqdefault.jpg?sqp=-oaymwEcCNACELwBSFXyq4qpAw4IARUAAIhCGAFwAcABBg==&rs=AOn4CLDcxnTgoy7L7ELSR3PFxZwnbXllaw",
"video_url": "https://www.youtube.com/watch?v=-tY3NnXpI7w",
"video_title": "Quinto Informe | Salud para las y los mexicanos",
"video_length_seconds": 31,
"transcription_with_timestamps": [
{
"text": "vamos avanzando y antes de que termine",
"start": 0.07,
"duration": 5.22
},
{
"text": "mi mandato voy a cumplir el compromiso",
"start": 2.59,
"duration": 5.4
},
{
"text": "de garantizar a todas y todos los",
"start": 5.29,
"duration": 5.88
},
{
"text": "mexicanos el derecho a la salud atenci\u00f3n",
"start": 7.99,
"duration": 7.14
},
{
"text": "m\u00e9dica con especialistas medicinas no",
"start": 11.17,
"duration": 5.88
},
{
"text": "solo el cuadro b\u00e1sico todos los",
"start": 15.13,
"duration": 4.26
},
{
"text": "medicamentos estudios intervenciones",
"start": 17.05,
"duration": 6.0
},
{
"text": "quir\u00fargicas porque la salud No es un",
"start": 19.39,
"duration": 6.12
},
{
"text": "privilegio es un derecho de nuestro",
"start": 23.05,
"duration": 5.219
},
{
"text": "pueblo por el bien de todos primero los",
"start": 25.51,
"duration": 6.439
},
{
"text": "pobres quinto informe",
"start": 28.269,
"duration": 3.68
}
],
"transcription_text": "vamos avanzando y antes de que termine mi mandato voy a cumplir el compromiso de garantizar a todas y todos los mexicanos el derecho a la salud atenci\u00f3n m\u00e9dica con especialistas medicinas no solo el cuadro b\u00e1sico todos los medicamentos estudios intervenciones quir\u00fargicas porque la salud No es un privilegio es un derecho de nuestro pueblo por el bien de todos primero los pobres quinto informe",
"transcription_source": "YouTube auto-generated captions",
"playlist_id": "PL-wEE8VmWaJ1Qu7xmy1hcWGBEYeniNvzE",
"playlist_title": "Quinto Informe",
"published_time_text": "1 year ago",
"retrieved_time": "2024-10-17 15:55:47.996840"
}
235 changes: 235 additions & 0 deletions data/-xsAW6Rv43U.json
Original file line number Diff line number Diff line change
@@ -0,0 +1,235 @@
{
"video_id": "-xsAW6Rv43U",
"video_thumbnail_url": "https://i.ytimg.com/vi/-xsAW6Rv43U/hqdefault.jpg?sqp=-oaymwEcCNACELwBSFXyq4qpAw4IARUAAIhCGAFwAcABBg==&rs=AOn4CLBgV39jKNXTRaGODU_RwmxNYAEOGQ",
"video_url": "https://www.youtube.com/watch?v=-xsAW6Rv43U",
"video_title": "Reporte de Avances del Istmo de Tehuantepec | Gobierno de M\u00e9xico",
"video_length_seconds": 117,
"transcription_with_timestamps": [
{
"text": "[M\u00fasica]",
"start": 0.44,
"duration": 6.069
},
{
"text": "el corredor interoce\u00e1nico informe el",
"start": 3.41,
"duration": 5.35
},
{
"text": "avance de obras a 28 de septiembre de",
"start": 6.509,
"duration": 5.51
},
{
"text": "2020 en el puerto de coatzacoalcos",
"start": 8.76,
"duration": 6.329
},
{
"text": "contin\u00faan tres obras activas los dos",
"start": 12.019,
"duration": 5.381
},
{
"text": "tramos de la ampliaci\u00f3n de 130 metros de",
"start": 15.089,
"duration": 5.251
},
{
"text": "muelle y el acceso carretero",
"start": 17.4,
"duration": 5.73
},
{
"text": "en el tramo de 80 metros con un avance",
"start": 20.34,
"duration": 5.1
},
{
"text": "de 80 y 6.2 por ciento",
"start": 23.13,
"duration": 4.37
},
{
"text": "comenzamos la colocaci\u00f3n de tensores de",
"start": 25.44,
"duration": 5.429
},
{
"text": "21.5 metros de longitud el armado de",
"start": 27.5,
"duration": 6.0
},
{
"text": "trav\u00e9s y contin\u00faa el hincado de pilotes",
"start": 30.869,
"duration": 6.12
},
{
"text": "el tramo de 50 metros tiene un avance de",
"start": 33.5,
"duration": 6.699
},
{
"text": "70 y 7.5 por ciento y ha comenzado la",
"start": 36.989,
"duration": 4.621
},
{
"text": "conformaci\u00f3n de los muros que",
"start": 40.199,
"duration": 4.11
},
{
"text": "fortalecer\u00e1n el muelle en el acceso",
"start": 41.61,
"duration": 5.85
},
{
"text": "carretero con un avance de 70 y 5.5 por",
"start": 44.309,
"duration": 5.371
},
{
"text": "ciento contin\u00faa la construcci\u00f3n del",
"start": 47.46,
"duration": 4.14
},
{
"text": "puente y la conformaci\u00f3n de las",
"start": 49.68,
"duration": 3.53
},
{
"text": "terracer\u00edas",
"start": 51.6,
"duration": 4.04
},
{
"text": "en el puerto de salina cruz con la",
"start": 53.21,
"duration": 4.25
},
{
"text": "construcci\u00f3n del rompeolas oeste",
"start": 55.64,
"duration": 4.05
},
{
"text": "continuamos con el colado de elementos",
"start": 57.46,
"duration": 4.36
},
{
"text": "prefabricados de concreto y con las",
"start": 59.69,
"duration": 5.369
},
{
"text": "pruebas de calidad correspondientes para",
"start": 61.82,
"duration": 5.04
},
{
"text": "conservar el entorno natural de la zona",
"start": 65.059,
"duration": 4.261
},
{
"text": "se lleva a cabo el programa de rescate y",
"start": 66.86,
"duration": 4.95
},
{
"text": "reubicaci\u00f3n del caracol p\u00farpura una",
"start": 69.32,
"duration": 5.19
},
{
"text": "especie en peligro de extinci\u00f3n",
"start": 71.81,
"duration": 5.01
},
{
"text": "en el tramo 1 del ferrocarril del istmo",
"start": 74.51,
"duration": 5.04
},
{
"text": "de tehuantepec de medias aguas veracruz",
"start": 76.82,
"duration": 5.34
},
{
"text": "pero oaxaca se lleva a cabo el programa",
"start": 79.55,
"duration": 5.82
},
{
"text": "de rescate y reubicaci\u00f3n de fauna al d\u00eda",
"start": 82.16,
"duration": 5.73
},
{
"text": "de hoy se han rescatado 11 especies",
"start": 85.37,
"duration": 5.13
},
{
"text": "protegidas de ar\u00e1cnidos anfibios y",
"start": 87.89,
"duration": 5.7
},
{
"text": "reptiles para cuidar la flora se han",
"start": 90.5,
"duration": 6.03
},
{
"text": "trasladado un aproximado de 195 especies",
"start": 93.59,
"duration": 6.09
},
{
"text": "a un vivero temporal para mantenerlas en",
"start": 96.53,
"duration": 4.8
},
{
"text": "buena salud y contribuir a la",
"start": 99.68,
"duration": 4.88
},
{
"text": "reforestaci\u00f3n con estas y otras acciones",
"start": 101.33,
"duration": 5.76
},
{
"text": "aplicamos las medidas de prevenci\u00f3n y",
"start": 104.56,
"duration": 4.35
},
{
"text": "mitigaci\u00f3n de impacto ambiental",
"start": 107.09,
"duration": 4.11
},
{
"text": "avanzando hacia un nuevo tipo de",
"start": 108.91,
"duration": 6.72
},
{
"text": "desarrollo gobierno de mexico",
"start": 111.2,
"duration": 4.43
}
],
"transcription_text": "[M\u00fasica] el corredor interoce\u00e1nico informe el avance de obras a 28 de septiembre de 2020 en el puerto de coatzacoalcos contin\u00faan tres obras activas los dos tramos de la ampliaci\u00f3n de 130 metros de muelle y el acceso carretero en el tramo de 80 metros con un avance de 80 y 6.2 por ciento comenzamos la colocaci\u00f3n de tensores de 21.5 metros de longitud el armado de trav\u00e9s y contin\u00faa el hincado de pilotes el tramo de 50 metros tiene un avance de 70 y 7.5 por ciento y ha comenzado la conformaci\u00f3n de los muros que fortalecer\u00e1n el muelle en el acceso carretero con un avance de 70 y 5.5 por ciento contin\u00faa la construcci\u00f3n del puente y la conformaci\u00f3n de las terracer\u00edas en el puerto de salina cruz con la construcci\u00f3n del rompeolas oeste continuamos con el colado de elementos prefabricados de concreto y con las pruebas de calidad correspondientes para conservar el entorno natural de la zona se lleva a cabo el programa de rescate y reubicaci\u00f3n del caracol p\u00farpura una especie en peligro de extinci\u00f3n en el tramo 1 del ferrocarril del istmo de tehuantepec de medias aguas veracruz pero oaxaca se lleva a cabo el programa de rescate y reubicaci\u00f3n de fauna al d\u00eda de hoy se han rescatado 11 especies protegidas de ar\u00e1cnidos anfibios y reptiles para cuidar la flora se han trasladado un aproximado de 195 especies a un vivero temporal para mantenerlas en buena salud y contribuir a la reforestaci\u00f3n con estas y otras acciones aplicamos las medidas de prevenci\u00f3n y mitigaci\u00f3n de impacto ambiental avanzando hacia un nuevo tipo de desarrollo gobierno de mexico",
"transcription_source": "YouTube auto-generated captions",
"playlist_id": "PL-wEE8VmWaJ10MTl3hvPGr1qWZTEkSHfo",
"playlist_title": "Reporte de Avances del Istmo de Tehuantepec | Gobierno de M\u00e9xico",
"published_time_text": "3 years ago",
"retrieved_time": "2024-10-17 18:04:24.091209"
}
Loading

0 comments on commit 0775039

Please sign in to comment.