Skip to content

Bump upper bound on network #3

Bump upper bound on network

Bump upper bound on network #3

Triggered via push August 31, 2024 18:17
Status Failure
Total duration 48s
Artifacts

cabal.yml

on: push
Matrix: continuous-integration
Fit to window
Zoom out
Zoom in

Annotations

11 errors
continuous-integration (9.10.1)
Process completed with exit code 1.
continuous-integration (9.4.5)
The job was canceled because "_9_10_1" failed.
continuous-integration (9.4.5)
The operation was canceled.
continuous-integration (9.0.2)
The job was canceled because "_9_10_1" failed.
continuous-integration (9.0.2)
The operation was canceled.
continuous-integration (9.2.8)
The job was canceled because "_9_10_1" failed.
continuous-integration (9.2.8)
The operation was canceled.
continuous-integration (9.6.4)
The job was canceled because "_9_10_1" failed.
continuous-integration (9.6.4)
The operation was canceled.
continuous-integration (9.8.2)
The job was canceled because "_9_10_1" failed.
continuous-integration (9.8.2)
The operation was canceled.