Skip to content

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #440

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #440

Status Failure
Total duration 38s
Artifacts

go.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 6 warnings
Test on go 1.18
Docker build failed with exit code 1
Test on go 1.20
The job was canceled because "_1_18" failed.
Test on go 1.20
Docker build failed with exit code 1
Test on go 1.19
The job was canceled because "_1_18" failed.
Test on go 1.19
Docker build failed with exit code 1
Test on go 1.18
Docker build failed with exit code 1, back off 3.497 seconds before retry.
Test on go 1.18
Docker build failed with exit code 1, back off 2.248 seconds before retry.
Test on go 1.20
Docker build failed with exit code 1, back off 4.574 seconds before retry.
Test on go 1.20
Docker build failed with exit code 1, back off 5.58 seconds before retry.
Test on go 1.19
Docker build failed with exit code 1, back off 8.677 seconds before retry.
Test on go 1.19
Docker build failed with exit code 1, back off 3.989 seconds before retry.