Skip to content

fix: update interval next deadline #66

fix: update interval next deadline

fix: update interval next deadline #66

Triggered via pull request February 10, 2025 11:24
@tisonkuntisonkun
synchronize #24
interval-fix
Status Failure
Total duration 1m 4s
Artifacts

ci.yml

on: pull_request
Matrix: Run tests
Required
0s
Required
Fit to window
Zoom out
Zoom in

Annotations

12 errors
Run tests (macos-14, stable)
Process completed with exit code 101.
Run tests (windows-2022, 1.83.0)
The job was canceled because "macos-14_stable" failed.
Run tests (windows-2022, 1.83.0)
The operation was canceled.
Run tests (windows-2022, stable)
The job was canceled because "macos-14_stable" failed.
Run tests (windows-2022, stable)
The operation was canceled.
Run tests (macos-14, 1.83.0)
The job was canceled because "macos-14_stable" failed.
Run tests (macos-14, 1.83.0)
The operation was canceled.
Run tests (ubuntu-22.04, 1.83.0)
The job was canceled because "macos-14_stable" failed.
Run tests (ubuntu-22.04, 1.83.0)
The operation was canceled.
Run tests (ubuntu-22.04, stable)
The job was canceled because "macos-14_stable" failed.
Run tests (ubuntu-22.04, stable)
The operation was canceled.
Required
Process completed with exit code 255.