chore: additional tests #12555
ci.yml
on: pull_request
Shard Docker Builds
8s
Shard Infrastructure Tests
5s
Shard Integration Tests
4s
Test Go
1m 53s
Test README
2m 7s
Lint
2m 52s
Proto Breaking Change Check
15s
Console
1m 31s
Test sqlc-gen-ftl
2m 34s
VSCode Extension
1m 18s
Intellij Plugin
2m 39s
Rebuild All
3m 28s
Build Docs
52s
Generate LSP Help
20s
Lint Architecture
16s
Console e2e
5m 2s
Matrix: build-docker-images
Matrix: Integration Test
Matrix: Infrastructure Test
Docker Success
0s
Integration Success
0s
Infrastructure Success
0s
Annotations
2 errors and 3 warnings
Lint:
home/runner/work/_temp/054c424f-ac17-43f6-92e7-94e44922640f.sh#L1
command not found
|
Rebuild All
Process completed with exit code 1.
|
Test sqlc-gen-ftl
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
Infrastructure Test (TestDistributedCron)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
Infrastructure Test (TestKubeScaling)
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
docker-admin-artifact
Expired
|
9.71 MB |
|
docker-console-artifact
Expired
|
9.73 MB |
|
docker-controller-artifact
Expired
|
27.1 MB |
|
docker-cron-artifact
Expired
|
10.3 MB |
|
docker-http-ingress-artifact
Expired
|
7.46 MB |
|
docker-lease-artifact
Expired
|
6.97 MB |
|
docker-provisioner-artifact
Expired
|
40.3 MB |
|
docker-runner-artifact
Expired
|
74 MB |
|
docker-runner-jvm-artifact
Expired
|
273 MB |
|
docker-schema-artifact
Expired
|
10.2 MB |
|
docker-timeline-artifact
Expired
|
7.02 MB |
|
kube-report-TestDistributedCron
|
184 KB |
|
kube-report-TestKubeScaling
|
517 KB |
|