Skip to content

Optimize EPSS

Optimize EPSS #4275

Triggered via push January 21, 2025 08:21
Status Failure
Total duration 3m 3s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 2.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
The operation was canceled.
build (3.11)
The job was canceled because "_3_10" failed.
build (3.11)
The operation was canceled.