DRC: math: Replace exponential function for performance #343
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
zephyr.yml
on: push
Matrix: build-linux
Matrix: build-windows
manifest-check
56s
LP64-WIP
3m 32s
compare-linux-win
35s
Annotations
13 errors
build-windows (-d, mtl)
Canceling since a higher priority waiting request for 'Zephyr-push-refs/heads/DRC_math_exp_optimization_dev' exists
|
build-windows (-d, mtl)
The operation was canceled.
|
build-linux (zmain, tgl tgl-h)
Canceling since a higher priority waiting request for 'Zephyr-push-refs/heads/DRC_math_exp_optimization_dev' exists
|
build-linux (zmain, tgl tgl-h)
The operation was canceled.
|
build-windows (imx8 imx8x imx8m)
Canceling since a higher priority waiting request for 'Zephyr-push-refs/heads/DRC_math_exp_optimization_dev' exists
|
build-windows (imx8 imx8x imx8m)
The operation was canceled.
|
build-windows (tgl tgl-h)
Canceling since a higher priority waiting request for 'Zephyr-push-refs/heads/DRC_math_exp_optimization_dev' exists
|
build-windows (tgl tgl-h)
The operation was canceled.
|
build-linux (mnfst, tgl tgl-h)
Canceling since a higher priority waiting request for 'Zephyr-push-refs/heads/DRC_math_exp_optimization_dev' exists
|
build-linux (mnfst, tgl tgl-h)
The operation was canceled.
|
build-windows (mtl)
Canceling since a higher priority waiting request for 'Zephyr-push-refs/heads/DRC_math_exp_optimization_dev' exists
|
build-windows (mtl)
The operation was canceled.
|
compare-linux-win
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
linux-build imx8 imx8x imx8m
Expired
|
10.7 MB |
|
linux-build lnl
Expired
|
9.61 MB |
|
linux-build mtl
Expired
|
10.7 MB |
|
linux-build -d mtl
Expired
|
11.2 MB |
|