Skip to content

links in docs

links in docs #3699

Triggered via push January 18, 2025 06:36
Status Failure
Total duration 6h 0m 25s
Artifacts

actions.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
test (nightly, ubuntu-latest)
Process completed with exit code 1.
test (1.9, ubuntu-latest)
The job running on runner GitHub Actions 4 has exceeded the maximum execution time of 360 minutes.
test (1.9, ubuntu-latest)
The operation was canceled.
test (1, ubuntu-latest)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
test (1, ubuntu-latest)
The operation was canceled.
test (1, macos-latest)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
test (1, macos-latest)
The operation was canceled.
test (nightly, ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636