Skip to content

Commit

Permalink
Merge branch 'develop' of https://github.com/NREL/SAM into ssc_1123_p…
Browse files Browse the repository at this point in the history
…rice_signals_to_retail_rate_naming
  • Loading branch information
brtietz committed Oct 12, 2023
2 parents abfc8ec + 7c27c15 commit 6997f12
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion test_results_win64.csv
Original file line number Diff line number Diff line change
Expand Up @@ -161,7 +161,7 @@ Generic System,None,756864000,NA,NA,;
PVWatts Wind Battery Hybrid,Single Owner,1021826240,6.05422,6.18632,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind Battery Hybrid,Host Developer,1.33484e+06,18.9935,20.2108,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind FuelCell Battery Hybrid,Single Owner,1029889280,6.10456,4.32316,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind FuelCell Battery Hybrid,Host Developer,1.33585e+06,49.6225,51.9929,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind FuelCell Battery Hybrid,Host Developer,1.33585e+06,49.458,51.8176,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
Photovoltaic Wind Battery Hybrid,Single Owner,1044604352,5.07468,5.9444,; Notice: Simulation time step is 60 minutes for pvsamv1. Notice: Simulation time step is 60 minutes for windpower.
Photovoltaic Wind Battery Hybrid,Host Developer,556256,35.098,20.2232,; Notice: Simulation time step is 60 minutes for pvsamv1. Notice: Simulation time step is 60 minutes for windpower.
Generic PVWatts Wind FuelCell Battery Hybrid,Single Owner,1787537152,14.7376,4.32818,; Notice: Simulation time step is 60 minutes for generic_system. Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
Expand Down

0 comments on commit 6997f12

Please sign in to comment.