Skip to content

Commit

Permalink
updated test results for peak shaving dispatch changes
Browse files Browse the repository at this point in the history
  • Loading branch information
brtietz committed Oct 19, 2023
1 parent 932e008 commit 29a819d
Showing 1 changed file with 16 additions and 16 deletions.
32 changes: 16 additions & 16 deletions test_results_win64.csv
Original file line number Diff line number Diff line change
Expand Up @@ -30,37 +30,37 @@ High-X Concentrating PV,Sale Leaseback,2.39082e+06,25.425,25.9389,;
High-X Concentrating PV,LCOE Calculator,2.39082e+06,NA,NA,;
High-X Concentrating PV,None,2.39082e+06,NA,NA,;
PV Battery,Residential,13089.9,12.3884,NA,;
PV Battery,Commercial,920326,6.70948,NA,;
PV Battery,Commercial,920060,6.71136,NA,;
PV Battery,Third Party,35731.2,NA,NA,;
PV Battery,Host Developer,920326,15.9063,16.21,;
PV Battery,Host Developer,920060,15.9107,16.21,;
PV Battery,Single Owner,217338048,7.98145,8.89941,;
PV Battery,Merchant Plant,217338048,8.57718,NA,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: IRR in target year is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: NPV is $-1.13359e+08. A negative NPV indicates project costs are higher than revenues.
PV Battery,Leveraged Partnership Flip,217338048,6.58535,8.89941,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs.
PV Battery,All Equity Partnership Flip,217338048,9.24929,8.89941,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: IRR in target year is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: NPV is $-1.08205e+07. A negative NPV indicates project costs are higher than revenues.
PV Battery,Sale Leaseback,217338048,9.94938,8.89941,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: NPV is $-2.17567e+07. A negative NPV indicates project costs are higher than revenues.
PVWatts Battery,Residential,13669.9,15.4126,NA,;
PVWatts Battery,Commercial,930019,13.0635,NA,;
PVWatts Battery,Third Party,11003.7,NA,NA,;
PVWatts Battery,Host Developer,930019,20.5638,16.2118,; Warning: NPV is $-385007. A negative NPV indicates project costs are higher than revenues.
Generic Battery,Residential,6694.13,65.3428,NA,;
Generic Battery,Commercial,359924,41.4888,NA,;
PVWatts Battery,Residential,13662.6,15.4244,NA,;
PVWatts Battery,Commercial,929768,12.5645,NA,;
PVWatts Battery,Third Party,10996.8,NA,NA,;
PVWatts Battery,Host Developer,929768,20.5947,16.2118,; Warning: NPV is $-387113. A negative NPV indicates project costs are higher than revenues.
Generic Battery,Residential,6695.48,65.3298,NA,;
Generic Battery,Commercial,359917,41.4897,NA,;
Generic Battery,Third Party,6690.41,NA,NA,;
Generic Battery,Host Developer,359924,30.4993,16.246,; Warning: NPV is $-501667. A negative NPV indicates project costs are higher than revenues.
Generic Battery,Host Developer,359917,30.5,16.246,; Warning: NPV is $-501680. A negative NPV indicates project costs are higher than revenues.
Generic Battery,Single Owner,31455232,79.2605,14.6211,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: IRR in target year is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: NPV is $-1.98351e+08. A negative NPV indicates project costs are higher than revenues.
Generic Battery,Merchant Plant,31455232,80.1274,NA,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: IRR in target year is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: NPV is $-2.34976e+08. A negative NPV indicates project costs are higher than revenues.
Generic Battery,Leveraged Partnership Flip,68109312,36.3834,40.5907,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs.
Generic Battery,All Equity Partnership Flip,68109312,45.8046,48.7088,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: IRR in target year is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs.
Generic Battery,Sale Leaseback,68109312,46.281,48.7088,; Warning: NPV is $-2.91411e+06. A negative NPV indicates project costs are higher than revenues.
Standalone Battery,Residential,-416.207,57.0774,NA,;
Standalone Battery,Commercial,-11647,432.124,NA,;
Standalone Battery,Commercial,-11919.8,426.61,NA,;
Standalone Battery,Third Party,-218.89,NA,NA,;
Standalone Battery,Host Developer,-11647,79.1743,16.2309,; Warning: NPV is $-696806. A negative NPV indicates project costs are higher than revenues.
Standalone Battery,Host Developer,-11919.8,76.7762,16.232,; Warning: NPV is $-690693. A negative NPV indicates project costs are higher than revenues.
Standalone Battery,Single Owner,-8397703,85.9518,88.6283,; Warning: IRR at end of analysis period is 82.4688%. A high IRR may indicate a project with unrealistically high returns. Warning: IRR in target year is 82.4686%. A high IRR may indicate a project with unrealistically high returns.
Standalone Battery,Merchant Plant,-8397703,25.7208,NA,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: IRR in target year is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: NPV is $-8.14106e+07. A negative NPV indicates project costs are higher than revenues.
Standalone Battery,Leveraged Partnership Flip,-8397703,81.3387,88.6283,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs.
Standalone Battery,All Equity Partnership Flip,-8397703,85.2731,88.6283,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs.
Standalone Battery,Sale Leaseback,-8397703,86.2847,88.6283,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: NPV is $-1.09395e+08. A negative NPV indicates project costs are higher than revenues.
ETES,Single Owner,-467272736,13.3154,7.40298,;
ETES,Single Owner,-465818784,13.3321,7.40168,;
PTES,Single Owner,-197586480,16.8906,10.3673,;
Physical Trough,Single Owner,376952608,12.1978,12.3469,;
Physical Trough,Merchant Plant,376952608,12.8693,NA,;
Expand Down Expand Up @@ -127,7 +127,7 @@ Wind Power,All Equity Partnership Flip,818888256,3.41969,4.33226,;
Wind Power,Sale Leaseback,818888256,3.79484,4.33226,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs.
Wind Power,LCOE Calculator,818888256,NA,NA,;
Wind Power,None,201595968,NA,NA,;
Fuel Cell,Commercial,1.93447e+06,7.23074,NA,;
Fuel Cell,Commercial,1.93447e+06,7.23075,NA,;
Fuel Cell,Single Owner,213518784,9.68564,6.53631,; Warning: IRR in target year is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: NPV is $-6.53556e+07. A negative NPV indicates project costs are higher than revenues.
Geothermal Power,Single Owner,261293360,7.22559,8.60947,;
Geothermal Power,Merchant Plant,261373328,7.64495,NA,; Warning: IRR at end of analysis period is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: IRR in target year is not a number (NaN). This can indicate that revenues are too low to cover costs, or that they are excessively high compared to costs. Warning: NPV is $-8.72971e+07. A negative NPV indicates project costs are higher than revenues.
Expand Down Expand Up @@ -159,11 +159,11 @@ Generic System,Sale Leaseback,756864000,29.4653,25.9936,; Warning: NPV is $-2.65
Generic System,LCOE Calculator,756864000,NA,NA,;
Generic System,None,756864000,NA,NA,;
PVWatts Wind Battery Hybrid,Single Owner,1021826240,6.05422,6.18632,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind Battery Hybrid,Host Developer,1.33484e+06,18.9935,20.2108,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind Battery Hybrid,Host Developer,1.33483e+06,18.9935,20.2108,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind FuelCell Battery Hybrid,Single Owner,1029889280,6.10456,4.32316,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind FuelCell Battery Hybrid,Host Developer,1.33585e+06,49.458,51.8176,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
PVWatts Wind FuelCell Battery Hybrid,Host Developer,1.33584e+06,49.458,51.8176,; Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
Photovoltaic Wind Battery Hybrid,Single Owner,1044604352,5.07468,5.9444,; Notice: Simulation time step is 60 minutes for pvsamv1. Notice: Simulation time step is 60 minutes for windpower.
Photovoltaic Wind Battery Hybrid,Host Developer,556256,35.098,20.2232,; Notice: Simulation time step is 60 minutes for pvsamv1. Notice: Simulation time step is 60 minutes for windpower.
Generic PVWatts Wind FuelCell Battery Hybrid,Single Owner,1787537152,14.7376,4.32818,; Notice: Simulation time step is 60 minutes for generic_system. Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
Generic PVWatts Wind FuelCell Battery Hybrid,Host Developer,3.13417e+06,98.7566,106.49,; Notice: Simulation time step is 60 minutes for generic_system. Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
Generic PVWatts Wind FuelCell Battery Hybrid,Host Developer,3.13426e+06,98.7535,106.486,; Notice: Simulation time step is 60 minutes for generic_system. Notice: Simulation time step is 60 minutes for pvwattsv8. Notice: Simulation time step is 60 minutes for windpower.
final_configuration_eof,none,NA,NA,NA,

0 comments on commit 29a819d

Please sign in to comment.