Skip to content

Update ruff.yml

Update ruff.yml #6

Triggered via push December 13, 2023 10:48
Status Failure
Total duration 24s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.8)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
The operation was canceled.