Skip to content

chore(deps): update all non-major dependencies #3362

chore(deps): update all non-major dependencies

chore(deps): update all non-major dependencies #3362

Triggered via pull request January 11, 2025 10:17
Status Failure
Total duration 36s
Artifacts

integrate.yaml

on: pull_request
Matrix: Coding Standards
Matrix: Dependency Analysis
Matrix: Static Code Analysis
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

12 errors and 1 warning
Tests (8.2, locked)
Process completed with exit code 4.
Dependency Analysis (8.3, locked)
Process completed with exit code 4.
Tests (8.1, locked)
The job was canceled because "_8_2_locked" failed.
Tests (8.1, locked)
The operation was canceled.
Tests (8.1, lowest)
The job was canceled because "_8_2_locked" failed.
Tests (8.1, lowest)
The operation was canceled.
Coding Standards (8.3, locked)
Process completed with exit code 2.
Tests (8.3, locked)
The job was canceled because "_8_2_locked" failed.
Tests (8.2, lowest)
The job was canceled because "_8_2_locked" failed.
Tests (8.3, lowest)
The job was canceled because "_8_2_locked" failed.
Tests (8.3, lowest)
The operation was canceled.
Static Code Analysis (8.3, locked)
Process completed with exit code 4.
Coding Standards (8.3, locked)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636