chore(deps): bump alpine from 3.18.5 to 3.21.0 #123
test.yaml
on: pull_request
Integration Test
12m 34s
K8s Integration Test
1m 57s
Module Integration Test
9m 33s
VM Integration Test
15s
Matrix: Build Test
Matrix: Test
Annotations
8 errors and 3 warnings
VM Integration Test
Process completed with exit code 1.
|
Build Test (ubuntu-latest)
Process completed with exit code 1.
|
Build Test (windows-latest)
The job was canceled because "ubuntu-latest" failed.
|
Build Test (windows-latest)
The operation was canceled.
|
Build Test (macos-latest)
The job was canceled because "ubuntu-latest" failed.
|
Build Test (macos-latest)
The operation was canceled.
|
K8s Integration Test
Process completed with exit code 1.
|
Integration Test
Process completed with exit code 1.
|
Module Integration Test
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Integration Test
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Test (ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|