Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Upgrade to Node16 #575

Draft
wants to merge 26 commits into
base: development
Choose a base branch
from
Draft

Upgrade to Node16 #575

wants to merge 26 commits into from

Conversation

tallowen
Copy link
Member

ngottlieb and others added 26 commits April 19, 2022 09:10
* add special logic to interpret jan 1st, 1990 as "unknown date"

* first pass at fixing gauge range display

* adjust reach summary flow display to account for gauge_estimated (#452)

* adjust reach summary flow display to account for gauge_estimated

* make gauge_estimated be reflected in nwi rivers table saerch results

* Bugfix/2472 events (#448)

* uses river{ events } rather than linker for events.

* not related to event ticket.

* change reach gallery to order by revision for consistency

* ensure links in river descriptions display with site-wide link styling

* ensure gauge links in beta box display as links

Co-authored-by: Nick Gottlieb <[email protected]>
* add special logic to interpret jan 1st, 1990 as "unknown date"

* first pass at fixing gauge range display

* adjust reach summary flow display to account for gauge_estimated (#452)

* adjust reach summary flow display to account for gauge_estimated

* make gauge_estimated be reflected in nwi rivers table saerch results

* Bugfix/2472 events (#448)

* uses river{ events } rather than linker for events.

* not related to event ticket.

* change reach gallery to order by revision for consistency

* ensure links in river descriptions display with site-wide link styling

* ensure gauge links in beta box display as links

* update trip report flow info so observation can be added separately from gauge reading

* add flow range help text modal to trip reports interface

* bring other gauge helper method in line with standardized flow description terms

* ensure gauge reading display doesnt wrap onto two lines in nwi-rivers-table

* v16

* v16

Co-authored-by: Nick Gottlieb <[email protected]>
* add special logic to interpret jan 1st, 1990 as "unknown date"

* first pass at fixing gauge range display

* adjust reach summary flow display to account for gauge_estimated (#452)

* adjust reach summary flow display to account for gauge_estimated

* make gauge_estimated be reflected in nwi rivers table saerch results

* Bugfix/2472 events (#448)

* uses river{ events } rather than linker for events.

* not related to event ticket.

* change reach gallery to order by revision for consistency

* ensure links in river descriptions display with site-wide link styling

* ensure gauge links in beta box display as links

* update trip report flow info so observation can be added separately from gauge reading

* add flow range help text modal to trip reports interface

* bring other gauge helper method in line with standardized flow description terms

* ensure gauge reading display doesnt wrap onto two lines in nwi-rivers-table

* v16

* v16

Co-authored-by: Nick Gottlieb <[email protected]>
* add special logic to interpret jan 1st, 1990 as "unknown date"

* first pass at fixing gauge range display

* adjust reach summary flow display to account for gauge_estimated (#452)

* adjust reach summary flow display to account for gauge_estimated

* make gauge_estimated be reflected in nwi rivers table saerch results

* Bugfix/2472 events (#448)
@aws-amplify-us-east-2
Copy link

This pull request is automatically being deployed by Amplify Hosting (learn more).

Access this pull request here: https://pr-575.d2e35jwpsu5vn3.amplifyapp.com

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
None yet
Projects
None yet
Development

Successfully merging this pull request may close these issues.

4 participants