Milestone Delivery 📫

With time running like the wind and July 2022 approaching, the 2nd milestone of the Veblocks grand is close to beeing fullfilled: Delivering 12 months of free and unrestricted access to the VeChain blockchain. This includes access to mainnet as well as testnet and a solo-sandbox.
At their peak the nodes provided around 150 million requests per day to all the vechain developers and users. The nodes were always fast and reliable, updated to the newest vechain-thor software and are now used across the whole vechain-ecosystem.

With this delivery notice I can hopefully fullfill the trust layed in me by the vechain foundation for the 2nd milestone and also apply for support for the 3rd milestone - another 12 months of free access to the veblocks nodes. I also apply for a slight amend of the 3rd milestone. Caused by higher data-center facilitiy cost and more users needing support, I propose a new 3rd milestone as shown below.

All steps to the 2nd milestone have been accomplished.

Milestone 1 — VeBlocks backend upgrade ✔️

Number Deliverable Specification Status
0a. Expansion Renting additional Server in different datacenters ✔️
0b. Installation Servers will be installed/configured with the needed software ✔️
0c. Configuration Redundant VeChain nodes will be set up on all locations ✔️
1 Clustering After all locations are online, the locations will be clustered together to provide higher uptime ✔️
2 Testing When the backend is in operating mode, an in tensive testing periode will be done ✔️
3 Go-Live When testing was successful, the backend will be online for public usage ✔️

Milestone 2 — Uptime, maintenance and improvements for 12 months ✔️

Number Deliverable Specification Status
0 monthly cost This includes all human resources and data-center facilities for the first 12 months ✔️



Amend of grant milestone 3

Original planning

Milestone 1 Milestone 2 Milestone 3 Total
Estimated Duration 30 d 365 d 365 d 760 d
Full-time equivalent (FTE) 3 1,5 1,5 6
Cost (up to $ 30,000) $ 2,340 $ 5,730 $ 5,730 $13,800

Adjusted plan

Milestone 1 Milestone 2 Milestone 3 Total
Estimated Duration 30 d 365 d 365 d 760 d
Full-time equivalent (FTE) 3 1,5 1,75 6,25
Cost (up to $ 30,000) $ 2,340 $ 5,730 $ 6,520 $14,590