Node 31 cycle report.
Type | Stored | Lost | Prod | Total |
---|---|---|---|---|
Repair | 39 | 0 | 0 | 39 |
Harvester | 120 | 0 | 0 | 120 |
Construction | 73 | 0 | 0 | 73 |
Combat | 75 | 0 | 0 | 75 |
ID | State | Status |
---|---|---|
31-SA | Docked | Minor damage to navblock |
31-SB | Docked | Nominal |
31-SC | In storage | Major damage to hull, inoperable |
31-SD | Docked | Misaligned RCS thrusters |
ID | State | Status |
---|---|---|
31-RA | Docked | Minor damage to chassis and cameras |
31-RB | Docked | Minor damage to radio |
31-RE | In storage | Minor damage to hull |
31-RF | Docked | Minor damage to chassis |
31-RH | Docked | Faulty rear sensors |
31-RG | In storage | Major damage to chassis |
Rovers not present in this list were scrapped or otherwise disposed of in a peaceful manner.
r ID | Type | Reported status | Reported directive | Observed deviations |
---|---|---|---|---|
C3 | Orbital, cargo relay | Storage full | None | None |
48 | Orbital, comm. relay | Nominal | None | Bitflips in responses |
22 | Orbital, comm. relay | Nominal | None | Packages postfixed with junk data |
8A | Surface, extraction | Storage full | None | None |
8B | Satellite, Extraction | Storage full | None | System clock malfunction |
Mineral storage: full.
Remass storage: 38%.
Facility structure: 83%.
Battery array condition: 61%.
Solar array condition: 86%.
Reactor state: suspended.
Reactor fuel reserves: approx. 30 cycles of cont. operation.
Directive: none. Awaiting command.
- Recommended action: authorize cargo transfer to a free cargo relay node.
- Recommended action: authorize construction of new local warehouse blocks.
Damage types: Kinetic impact, burn, overvoltage. Required components for repair:
Item | In Storage | Can Produce | Can acq. from sister |
---|---|---|---|
3200-SP Hardened steel plates | Yes | Yes | 8A, 8B |
3888-RD Steel axis | Yes | Yes | 8A, 8B |
3720-ST Light support beams | Yes | Yes | 8A, C3 |
4303-WC Copper wiring | Yes | Yes | 8B |
4304-WG Gold wiring | No | Yes | 8B |
6320-TH Small chem. thruster nozzle | No | No | 8A, C3 |
6480-SS Hvy. Servomotor | Yes | No | 8B |
7322-XG Standard CPU | No | No | C3, 8A, 22 |
7345-XG Standard QPU | No | No | C3 |
9827-TG Thermal gel | Yes | No | 8A |
Recommended action:
- Authorize exchange with sister 8A or C3 for item 6320-TH
- Authorize exchange with sister C3, 8A or 22 for item 7322-XG
- Authorize exchange with sister C3 for item 7345-XG
- Authorize major shuttle repairs
Node 31 is dormant, no behaviour directives are in place. Node 31 has been dormant for: 348 cycles
Recommended actions:
- Please respond.
A small cave-in has occured in cargo tunnel in underground warehouse block 3F. Cave-in cause determined to be incorrectly assessed rock density during construction. Cave-in cleared. Extensive seismic scans performed. 6 potential failure points detected in warehouses 3F, 3C and 39. Structural reinforcements added.
Updated priorities on energy consumption. Warehouse blocks with non-sensitive contents have been depressurized, power taken from non-essential systems such as internal cameras. To prevent further incidents, seismic scan frequency has been increased.
#writing