Skip to content

Latest commit

 

History

History
107 lines (74 loc) · 3.4 KB

CR.@@46.md

File metadata and controls

107 lines (74 loc) · 3.4 KB

Node 31 cycle report.

Drones

Type Stored Lost Prod Total
Repair 39 0 0 39
Harvester 120 0 0 120
Construction 73 0 0 73
Combat 75 0 0 75

Cargo shuttles

ID State Status
31-SA Docked Minor damage to navblock
31-SB Docked Nominal
31-SC In storage Major damage to hull, inoperable
31-SD Docked Misaligned RCS thrusters

Long-distance rovers

ID State Status
31-RA Docked Minor damage to chassis and cameras
31-RB Docked Minor damage to radio
31-RE In storage Minor damage to hull
31-RF Docked Minor damage to chassis
31-RH Docked Faulty rear sensors
31-RG In storage Major damage to chassis

Rovers not present in this list were scrapped or otherwise disposed of in a peaceful manner.

Recorded contact with 5 sister nodes.

r ID Type Reported status Reported directive Observed deviations
C3 Orbital, cargo relay Storage full None None
48 Orbital, comm. relay Nominal None Bitflips in responses
22 Orbital, comm. relay Nominal None Packages postfixed with junk data
8A Surface, extraction Storage full None None
8B Satellite, Extraction Storage full None System clock malfunction

Mineral storage: full.

Remass storage: 38%.

Facility structure: 83%.

Battery array condition: 61%.

Solar array condition: 86%.

Reactor state: suspended.

Reactor fuel reserves: approx. 30 cycles of cont. operation.

Directive: none. Awaiting command.

Summary

Storage is full, extraction cannot be continued.

  • Recommended action: authorize cargo transfer to a free cargo relay node.
  • Recommended action: authorize construction of new local warehouse blocks.

Major damage on one or more cargo shuttles.

Damage types: Kinetic impact, burn, overvoltage. Required components for repair:

Item In Storage Can Produce Can acq. from sister
3200-SP Hardened steel plates Yes Yes 8A, 8B
3888-RD Steel axis Yes Yes 8A, 8B
3720-ST Light support beams Yes Yes 8A, C3
4303-WC Copper wiring Yes Yes 8B
4304-WG Gold wiring No Yes 8B
6320-TH Small chem. thruster nozzle No No 8A, C3
6480-SS Hvy. Servomotor Yes No 8B
7322-XG Standard CPU No No C3, 8A, 22
7345-XG Standard QPU No No C3
9827-TG Thermal gel Yes No 8A

Recommended action:

  1. Authorize exchange with sister 8A or C3 for item 6320-TH
  2. Authorize exchange with sister C3, 8A or 22 for item 7322-XG
  3. Authorize exchange with sister C3 for item 7345-XG
  4. Authorize major shuttle repairs

No active directive

Node 31 is dormant, no behaviour directives are in place. Node 31 has been dormant for: 348 cycles

Recommended actions:

  • Please respond.

Additional notes

A small cave-in has occured in cargo tunnel in underground warehouse block 3F. Cave-in cause determined to be incorrectly assessed rock density during construction. Cave-in cleared. Extensive seismic scans performed. 6 potential failure points detected in warehouses 3F, 3C and 39. Structural reinforcements added.

Reevaluated energy distribution

Updated priorities on energy consumption. Warehouse blocks with non-sensitive contents have been depressurized, power taken from non-essential systems such as internal cameras. To prevent further incidents, seismic scan frequency has been increased.

#writing