Time Limit for evaluation run #35
Replies: 1 comment 1 reply
-
Hi, there will be a time limit, but we want to first see how teams perform. Time limit is mostly for us to programmatically kill the simulation during evaluation and will be set to a more than reasonable time (but after we see the first runs). I do not expect it to be an issue, i.e. if you hit the time limit it would probably mean the UAV crashed or is stuck. And yes, time taken will be a major scoring factor, alongside number of correct detections. |
Beta Was this translation helpful? Give feedback.
1 reply
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
-
Would there be a time limit for the evaluation run? Would there be a scoring with respect to the time taken to complete the mission?