Notifications
You must be signed in to change notification settings - Fork 7
/
Copy pathch-exec-tc.tex
660 lines (561 loc) · 32.8 KB
/
ch-exec-tc.tex
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
\chapter{DUNE Far Site Technical Coordination}
\label{ch:exec-tc}
\textit{This chapter provides a brief introduction to the DUNE far site technical coordination. The text below closely follows that found in the introductory chapters of Volume~\volnumbertc{}, \voltitletc{}, where many more details may be found.}
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
\section{Overview} % done
The \dword{dune} collaboration has responsibility for the design
and construction of the \dword{dune} \dword{fd}. Groups of collaboration
institutions, referred to as consortia, assume responsibility for
the different detector subsystems. The activities of the consortia are
overseen and coordinated through the \dword{dune} \dword{tc} organization
headed by the \dword{dune} \dword{tcoord}. The \dword{tc} organization
provides project support functions such as safety coordination,
engineering integration, change control, document management, scheduling,
risk management, and technical review planning. \dword{dune} \dword{tc}
manages internal, subsystem-to-subsystem interfaces, and is responsible
for ensuring the proper integration of the different subsystems.
\dword{dune} \dword{tc} works closely with the support teams of its
\dword{lbnf-dune} partners within the framework of a \dword{jpo} to
ensure coherence in project support functions across the entire global
enterprise. To ensure consistency of the \dword{dune} \dword{esh}
and \dword{qa} programs with those across \dword{lbnf-dune}, the
\dword{lbnf-dune} \dword{esh} and \dword{qa} managers, who sit within
the \dword{jpo}, are embedded within the \dword{dune} \dword{tc}
organization.
The \dword{lbnf-dune} \dword{integoff} under the
direction of the \dword{ipd} incorporates the on-site team responsible
for coordinating integration and installation activities at the \dword{surf}.
Detector integration and installation activities are supported by the
\dword{dune} consortia, which maintain responsibility for ensuring
proper installation and commissioning of their subsystems. External
\dword{dune} interfaces with the on-site integration and installation
activities are managed through the \dword{jpo}.
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
\section{Global Project Organization} % done
\label{sec:exec-tc-partners}
\subsection{Global Project Partners}
The \dword{lbnf} project is responsible for providing both the
\dword{cf} and supporting infrastructure (cryostats and
cryogenics systems) that house the \dword{dune} \dword{fd}
modules.
The international \dword{dune}
collaboration under the direction of its management team is
responsible for the detector components. The \dword{dune} \dword{fd}
construction project encompasses all activities required for designing
and fabricating the detector elements and incorporates contributions
from a number of international partners. The organization of %the global
\dword{lbnf-dune}, which encompasses both project elements, is
shown in Figure~\ref{fig:DUNE_global}.
\begin{dunefigure}[Global project organization]{fig:DUNE_global}
{The global \dword{lbnf-dune} organization.}
\includegraphics[width=0.95\textwidth]{FS_Integration_OrgChart_notitle}
\end{dunefigure}
The overall
coordination of installation activities in the underground caverns
is managed as a separate element of \dword{lbnf-dune} under the
responsibility of the \dword{ipd}, who is appointed by and reports
to the \dword{fnal} director. To ensure coordination across
all elements of \dword{lbnf-dune}, the \dword{ipd} connects to both
the facilities and detector construction projects through ex-officio
positions on the \dword{lbnf} project management board and
\dword{dune} \dword{exb}, respectively. The \dword{ipd} receives support from the \dword{sdsd},
a \dword{fnal} division established to
provide the necessary supporting infrastructure for installation, commissioning, and operation
of the \dword{dune} far detector.
%The \dword{dune} consortia maintain responsibility for the installation and commissioning of their detector subsystems and \dword{lbnf} retains responsibility for the installation and commissioning of supporting infrastructure items. --- already said
%\subsection{EFIG}
The \dword{efig} is the body responsible for the required high-level
coordination between the \dword{lbnf} and \dword{dune} construction
projects.
The \dword{efig} is augmented by the \dword{jpo} that supports both
the \dword{lbnf} and \dword{dune} projects as well as the integration
effort that connects the two together. The \dword{jpo} combines
project support functions that exist within the different elements
of the global project to ensure proper coordination across the entire
\dword{lbnf-dune} enterprise. Project functions coordinated globally
through the \dword{jpo} are shown in Figure~\ref{fig:DUNE_jpo} along
with the team members %personnel
currently supporting these functions %The team members who support these functions
within the \dword{jpo} framework.
These team members are drawn from the \dword{lbnf} project office, \dword{dune} \dword{tc},
and \dword{lbnf-dune} \dword{integoff} personnel.
\begin{dunefigure}[JPO functions]{fig:DUNE_jpo}
{\dword{jpo} global support functions and teams}
\includegraphics[width=0.85\textwidth]{JPO_OrgChart_v4}
\end{dunefigure}
\subsection{Coordinated Global Project Functions}
Project support functions requiring \dword{jpo} coordination include
safety, engineering integration, change control and document
management, scheduling, review planning and oversight, and development
of partner agreements.
Planning activities related to detector installation and the provision
of surface facilities are also currently embedded within the framework
of the \dword{jpo} to ensure that all project elements are properly
incorporated. At the time when \dword{lbnf} \dword{fscf} delivers
\dword{aup} of the underground detector caverns at \dword{surf}, the
coordination of on-site activities associated with detector installation
and the operation of surface facilities will be fully embedded within
the \dword{lbnf}/\dword{dune} \dword{integoff} under the direction of the \dword{ipd}.
%%%
\subsection{Coordinated Safety Program}
\label{sec:dune_safety}
To ensure a consistent approach to safety across \dword{lbnf-dune},
a single \dword{lbnf-dune} \dword{esh} manager reports
to the \dword{lbnf} project director, the \dword{ipd}, and \dword{dune}
management (via the \dword{dune} \dword{tcoord}). This individual
directs separate safety teams responsible for implementing the
\dword{lbnf-dune} \dword{esh} program within %both
the individual \dword{lbnf}
and \dword{dune} projects as well as the coordinated \dword{lbnf}/\dword{dune}
installation activities at \dword{surf}. The safety organization
is shown in Figure~\ref{fig:dune_esh}.
\begin{dunefigure}[\dshort{lbnf-dune} \dshort{esh}]{fig:dune_esh}
{High level \dword{lbnf-dune} \dword{esh} organization.}
\includegraphics[width=0.85\textwidth]{DUNE_Safety_Org_Chart_v2}
\end{dunefigure}
The \dword{lbnf-dune} \dword{esh} manager works with the \dword{fnal}
and \dword{surf} safety organizations to ensure that all project-related
activities comply with the rules and regulations of the host
organizations.
The \dword{jpo} engineering safety assurance team defines a common
set of design and construction rules (mechanical and electrical) to
ensure consistent application of engineering standards and engineering
documentation requirements across \dword{lbnf-dune}.
Following lessons learned from the processes used for the
\dword{protodune} detectors, an important mandate of the engineering
safety assurance team is to ensure that safety issues related to
component handling and installation are incorporated within the
earliest stages of the design review process.
\subsection{%Engineering
Detector Integration}
\label{sec:dune_engineering}
A central \dword{jpo} engineering team is responsible for building
an integrated model of the detectors within their supporting
infrastructure and the \dword{fscf} that house them. %The \dword{jpo}
This team incorporates approved changes as they
are received and checks to ensure that no errors or space conflicts
are introduced into the model. After receiving the appropriate sign-offs from all
parties, the %\dword{jpo}
team tags a new frozen release of the model
and makes it available to the design teams as the current release
against which the next set of design changes will be generated.
Electrical engineers are incorporated within %the central \dword{jpo}
this team to ensure proper integration of the detector electrical
components.
The \dword{jpo} engineering team is also responsible for documenting and
controlling the interfaces between the \dword{lbnf} and \dword{dune}
projects as well as the interfaces between these projects and the
\dword{lbnf}/\dword{dune} installation activities at \dword{surf}.
The \dword{lbnf-dune} project partners have agreed to adopt
the formal change control process developed previously for the
\dword{lbnf} project. The change control process applies to
proposed modifications of requirements, technical designs,
schedule, overall project scope, and assigned responsibilities
for individual scope items.
\subsection{Schedule and Milestones} % done
\label{sec:dune_schedule}
The \dword{jpo} team is responsible for creating a single project
schedule for \dword{lbnf-dune} that incorporates all \dword{lbnf} and
\dword{dune} activities together with the installation activities at
\dword{surf}, incorporating all interdependencies. This schedule
will be used to track the status of the global enterprise. %Non-\dword{doe} activities will not be
%tracked using the formal \dword{evms} procedures required for the
%\dword{doe} project activities, but rather through regular assessments
%of progress towards completion by the management teams responsible
%for those activities.
\dword{doe} activities will be
tracked using the formal \dword{evms} procedures required for the
\dword{doe} project activities; non-\dword{doe} activities will be tracked through regular assessments
of progress towards completion by the management teams responsible
for those activities.
\subsection{Partner Agreements and Financial Reporting} % done
\label{sec:dune_agreements}
Partner contributions to all project elements will be detailed
in a series of written agreements. In the case of \dword{lbnf},
these contributions will be spelled out in bilateral agreements
between the \dword{doe} and each of the contributing partners. In
the case of \dword{dune}, a \dword{mou} will
detail the contributions of all participating partners.
A series of more technical agreements describing the exact
boundaries between partner contributions and the terms and
conditions under which they will be delivered will %lie just beneath
accompany the primary agreements.
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
\section{DUNE Far Detector Organization} % done
%%%%%%%%%%%%%%%%%%%%%%
\subsection{Detector Design and Construction} % done
\label{sec:es-tc-det-const}
The \dword{dune} \dword{fd} construction project refers collectively
to the activities associated with the design and construction of
necessary detector components. \dword{dune} collaboration management
is responsible for overseeing this portion of \dword{lbnf-dune} and
ensuring its successful execution. The high-level \dword{dune}
collaboration management team consisting of the co-spokespersons,
\dword{tcoord}, and \dword{rcoord} is responsible for the
management of the construction project.
Construction of the \dword{fd} modules is carried out by
consortia of collaboration institutions who assume responsibility
for detector subsystems. Each consortium plans and executes the
construction, installation, and commissioning of its subsystem.
%Management of each consortium is through
Each consortium is managed by an overall consortium leader
and a technical lead. The consortium leader chairs an institutional
board composed of one representative from each of the %collaborating
institutions contributing to the activities of the consortium. Major
consortium decisions such as technology selections and assignment of
responsibilities %within
among the institutions %should
pass through its institutional board. These decisions are then passed
as recommendations to the \dword{dune} \dword{exb} for formal collaboration approval.
Because the consortia operate as self-managed entities, a strong
\dfirst{tc} organization is required to ensure overall integration
of the detector elements and successful execution of the detector
construction project. \Dword{tc} areas of responsibility include
general project oversight, systems engineering, \dword{qa}, and
safety. \Dword{tc} also supports the planning and execution
of integration and installation activities at \dword{surf}.
The \dword{tcoord} manages the overall detector construction
project through regular technical and project board meetings with
the consortium leadership teams and members of the \dword{tc}
organization.
The \dword{tc} organization, headed by the \dword{tcoord}, supports the work of
the consortia and has responsibility for a number of major project
support functions prior to the delivery of detector components to
\dword{surf}, including
\begin{itemize}
\item ensuring that each consortium has a well defined and complete
scope, that interactions between consortia are sufficiently
well defined, and that any missing scope outside of the
consortia is provided through other sources such as collaboration
common funds;
\item defining and documenting scope boundaries and technical
interfaces both between consortia and with \dword{lbnf};
\item developing an overall schedule with appropriate dependencies
between activities covering all phases of the project;
\item ensuring that appropriate engineering and safety standards
are developed, understood, and agreed to by all key stakeholders
and that these standards are conveyed to and understood by each
consortium;
\item ensuring that all \dword{dune} requirements on \dword{lbnf}
for \dword{fscf}, cryostat, and cryogenics are clearly defined and
agreed to by each consortium;
\item ensuring that each consortium has well developed and reviewed
component designs, construction plans, \dword{qc} processes, and
safety programs; and
\item monitoring the overall project schedule and the progress of
each consortium towards delivering its assigned scope.
\end{itemize}
The \dword{dune} \dword{tc} organizational structure is shown
in Figure~\ref{fig:DUNE_tc}.
\begin{dunefigure}[DUNE technical coordination organization]{fig:DUNE_tc}
{\dword{dune} \dfirst{tc} organizational chart.}
\includegraphics[width=0.99\textwidth]{TC_OrgChart_v2}
\end{dunefigure}
The \dword{tc} project coordination team incorporates \dword{esh},
\dword{qa}, and project controls specialists. Overall integration
of the detector elements is coordinated through the \dword{tc}
engineering support team headed by the \dword{lbnf-dune} systems
engineer and lead \dword{dune} electrical engineer. Planning
coordinators for integration and installation activities at
\dword{surf} (who sit within the \dword{lbnf-dune} \dword{integoff}) also head the \dword{tc} installation interfaces team.
The dual placement of these individuals facilitates the required
coordination of integration and installation planning efforts between
the core team directing these activities and the \dword{dune}
consortia. %, which maintain primary responsibility for the individual detector subsystems.
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
\subsection{Detector Installation and Commissioning} % done
\label{sec:es-tc-det-instal}
The \dfirst{ipd} has
responsibility for coordinating the planning and execution of
the \dword{lbnf-dune} installation activities, both
in the underground detector caverns at \dword{surf} and in
nearby surface facilities.
The \dword{lbnf-dune} \dword{integoff} will evolve over
time to incorporate the team in South Dakota responsible for the
overall coordination of on-site installation activities. In the
meantime, the installation planning team within the \dword{integoff} works with
the \dword{dune} consortia and \dword{lbnf} project team members
to plan these activities. This installation team is responsible for specification
and procurement of common infrastructure items associated with
installation of the detectors.
The organization of the on-site team is
shown in Figure~\ref{fig:io-org-chart}.
\begin{dunefigure}[Integration office installation team org chart]{fig:io-org-chart}
{\Dword{integoff} installation team organization chart}
\includegraphics[width=0.95\textwidth]{org-farsite-io.pdf}
\end{dunefigure}
The full on-site \dword{integoff} team includes rigging teams responsible for moving
materials in and out of the shaft, through the underground drifts,
and within the detector caverns, and personnel responsible
for overseeing safety and logistics planning.
The underground caverns coordinator is responsible for managing all
activities in the two underground detector caverns and the
\dword{cuc}. The detector installation teams, distinct from the \dword{integoff} installation team,
incorporate a substantial number of scientific and
technical personnel from the \dword{dune} consortia. \Dword{integoff} coordinators
of the detector installation effort are jointly placed within
\dword{dune} \dword{tc} to facilitate consortia involvement in
detector installation activities. Any modifications to the facilities
occurring after \dword{aup} are managed by the underground cavern
coordinator under the direction of the \dword{ipd}.
The \dword{lbnf-dune}
\dword{esh} manager heads the on-site safety organization and reports
to the \dword{ipd} to support the execution of this
responsibility. The far site \dword{esh} coordinators %sitting under the \dword{lbnf-dune} \dword{esh} manager
oversee the day-to-day execution
of the installation work.
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
\section{Facility Description}
\label{sec:es-tc-facility}
The \dword{dune} underground campus at the \dword{surf} \dword{4850l} is shown in
Figures~\ref{fig:caverns} and~\ref{fig:dune-underground}. The primary path for both personnel
and material access to the underground excavations is through the Ross Shaft.
\begin{dunefigure}[Underground campus]{fig:dune-underground}
{Underground campus at the \dword{4850l}.}
\includegraphics[width=0.75\textwidth]{underground_campus_vertical}
\end{dunefigure}
\dword{lbnf} will provide facilities and services, on the surface and
underground, to support the \dword{dune} \dword{fd}. This includes
logistical, cryogenics, electrical, mechanical, cyber, and environmental
facilities and services. All of these facilities are provided for the
safe and productive operation of the \dwords{detmodule}.
On the surface, a new compressor building is being constructed
adjacent to the Ross headframe. This building will house the cryogenics
systems for receiving cryogenic fluids and preparing them for delivery
down the Ross Shaft. New piping is being installed down the
shaft compartment to transport \dword{gar} and nitrogen underground
where they will be reliquefied.
Two large detector caverns
are being excavated. Each of these caverns will support two
\larmass{}-capacity cryostats. The caverns, labeled north and
south, are \SI{144.5}{\meter} long, \SI{19.8}{\meter} wide, and
%\SI{27.95}{\meter}
\SI{28.0}{\meter} high. The tops of the cryostats are approximately
aligned with the \dword{4850l} of \dword{surf}, with the bottoms resting
at the 4910L. A \SI{12}{\meter} space between the cryostats will
be used %as part of
for the detector installation process, for placement of
cryogenic pumps and valves, and for access to the 4910L. The
\dword{cuc}, between the north and south caverns, is \SI{190}{\meter}
long, \SI{19.3}{\meter} wide, and \SI{10.95}{\meter} high.
The \dword{sdwf} is planned as a leased \SI{5000}{\square\meter} facility, hosted by
\dword{sdsd}, to be located within a maximum one-day roundtrip of \dword{surf}.
It must be in place for receiving cryostat and detector
components approximately six months before \dword{aup}
of the underground detector caverns is received.
Laydown space near the Ross headframe is extremely
limited. For this reason, the transportation of materials from
the \dword{sdwf} to the top of the Ross shaft requires careful
coordination. The \dword{lbnf-dune} logistics manager works
with the \dword{cmgc} through the end of excavation activities
and with other members of the \dword{integoff} team to coordinate transport
of materials into the underground areas. Since no detector materials or
equipment can be shipped directly to \dword{surf}, %the Ross or Yates headframes,
the \dword{sdwf} will be used for both short- and long-term storage, as
well as for any re-packaging of items required prior to transport
into the underground areas.
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
\section{Far Detector Construction Management}
\label{sec:es-tc-det-mgmt}
Eleven \dword{fd} consortia have been formed to cover
the subsystems required for the \dword{sp} and \dword{dp} detector technologies (Figure~\ref{fig:DUNE_consortia}). % currently underconsideration.
%In particular, t
Three consortia (SP-APA, SP-TPC
Electronics and SP-Photon Detection) pursue subsystems specific to
the \dword{sp} design and another three consortia (DP-CRP, DP-TPC
Electronics, and DP-Photon Detection) pursue designs for \dword{dp}-specific
subsystems. %An additional f
Five consortia (HV System, \dword{daq},
\dword{cisc}, Calibration, and Computing)
have responsibility for subsystems common to both detector
technologies.
\begin{dunefigure}[DUNE far detector consortia]{fig:DUNE_consortia}
{Consortia associated with the \dword{fd} construction effort along with their
current leadership teams. CL refers to consortium leader
and TL refers to technical lead.}
\includegraphics[width=0.99\textwidth]{Consortia_Org_Chart}
\end{dunefigure}
The complete scope of the \dword{dune} construction project is captured in a
\dword{wbs} to define and document the distribution of deliverables among
the consortia. In combination with interface documentation, the
\dword{wbs} is used to validate that all necessary scope is covered. The
\dword{wbs} is also used as a framework for building \dword{dune}
detector cost estimates.
The highest-level layers of the \dword{dune} \dword{wbs} are summarized
in Figure~\ref{fig:WBS_level2}. At level 1 the \dword{wbs} is broken down into
six elements, which correspond to \dword{tc} (TC in the figure), %the five \dword{dune} detector modules (
four
\dword{fd} modules, and a \dword{nd}. The scope documented %here
in this \dword{tdr} is fully contained within the elements of level-1 items 1 through 3, the \dword{tc}, a \dword{sp} \dword{fd} module, and a \dword{dp} \dword{fd} module.
\begin{dunefigure}[DUNE WBS at level 2]{fig:WBS_level2}
{High level \dword{dune} \dword{wbs} to level 2.}
\includegraphics[width=0.75\textwidth]{WBS_level2_v2}
\end{dunefigure}
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
\section{Integration Engineering}
\label{sec:es-coord-integ-sysengr}
Integration engineering for \dword{dune} encompasses three principal focus areas. First, it %focuses on configuring the
covers configuration of the mechanical and electrical systems of each \dword{detmodule} and management of
the interfaces within them; this includes verifying that subassemblies
and their interfaces %are built
conform to the approved design of each detector element.
%e.g., \dword{apa} or \dword{pds}. The second major focus
A second area is assurance that the \dwords{detmodule} can be integrated and
installed into their final configurations. Third, it covers %The third major focus is
integration of the necessary services provided by \dword{fscf}
with the \dwords{detmodule}. The overall effort involves
%To this end, t
the \dword{jpo} engineering team, who maintains
subsystem component documentation for detector
configuration management, and
the consortia, who provide engineering data for their detector subsystems to the \dword{jpo} team for incorporation into the global configuration files.
An integration mechanism has been developed to manage and create an
overall model of interfaces both within a \dword{detmodule} and
between a \dword{detmodule} and facilities. The mechanism defines
integration nodes, %which can be thought of as focus areas. The
between which the \dword{jpo} engineering team carries out and
manages interfaces. % between the nodes.
Figure~\ref{fig:integration_nodes} shows the interfaces and nodes between a
\dword{detmodule} and the facilities it requires. The \dword{jpo} engineering
team also ensures that the interfaces are appropriately defined
and managed for the \dword{daq} room in the \dword{cuc} and the surface
control and network rooms. Interfaces with \dword{lbnf}
are managed at the boundaries of each integration node.
Interface documents are developed and maintained to manage the
interfaces between consortia and between each consortium and
\dword{lbnf}.
\begin{dunefigure}[Integration nodes and interfaces]{fig:integration_nodes}
{Overall integration nodes and interfaces. The items
provided by \dword{lbnf} within the cavern are shown on the left and the items provided by
\dword{dune} are on the right.}
\includegraphics[width=0.7\textwidth]{Integration_nodes.png}
\end{dunefigure}
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
\section{Reviews}
\label{sec:es-tc-reviews}
The \dword{integoff} and \dword{tc} review all stages of detector development
and work with each consortium to arrange reviews of the design
(\dword{cdrev}, \dword{pdr} and \dword{fdr}), production (\dword{prr}
and \dword{ppr}), installation (\dword{irr}), and operation
(\dword{orr}) of their system. The reviews are organized by the
\dword{jpo} \dword{ro}. These
reviews provide information to the \dword{tb}, \dword{exb}, and \dword{efig}
in evaluating technical decisions.
Review reports are tracked by the \dword{jpo} \dword{ro} and \dword{tc} and provide
guidance on key issues that require engineering oversight by the
\dword{jpo} engineering team. The \dword{ro} maintains a
calendar of \dword{dune} reviews.
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
\section{Quality Assurance}
\label{sec:es-tc-qa}
\dshort{dune} \dword{tc} monitors technical contributions from
collaborating institutions and provides centralized project
coordination functions. One part of this project coordination is
standardizing \dfirst{qa}/\dfirst{qc} practices, a facet
of which is to assist consortia in defining and implementing
\dword{qa}/\dword{qc} plans that maintain uniform, high
standards across the entire detector construction
effort. Figure~\ref{fig:fnal_qa} shows how \dword{dune} \dword{tc}
derives its \dword{qa} program from the principles of the \fnal \dword{qa} program:
requirements %are flowed
flow down through the \dword{lbnf-dune}
\dword{qa} program into the \dword{qc} plans developed for consortium fabrication of
detector components and integration and installation of the detector.
\begin{dunefigure}[Quality assurance flowdown]{fig:fnal_qa}
{Flow-down of \fnal \dword{qa} to consortia}
\includegraphics[width=0.85\textwidth]{fnal_qa.pdf}
\end{dunefigure}
The \dword{qa} effort includes design, production readiness, and
progress reviews as appropriate for the \dword{dune} detector
subsystems, as was done for \dword{pdsp} under \dword{tc}
oversight.
The primary objective of the \dword{lbnf-dune} \dword{qa} program is
to assure quality in the construction of the \dword{lbnf} facility and
\dword{dune} experiment while providing protection of
\dword{lbnf-dune} personnel, the public, and the environment. The
\dword{qa} plan aligns \dword{lbnf-dune} \dword{qa} activities, which
are spread around the world, with the principles of the \dword{fnal} Quality
Assurance Manual. The manual identifies the \dword{fnal} Integrated Quality
Assurance Program features that serve as the basis for the
\dword{lbnf-dune} \dword{qa} plan.
A key element of the \dword{lbnf-dune} \dword{qa} plan is the
concept of graded approach; that is, applying a level of analysis,
controls, and documentation commensurate with the potential for an
environmental, safety, health, or quality impact. To promote continuous improvement, \dword{dune} \dword{tc} will develop a
lessons learned program based on the \dword{fnal} Office of Project Support
Services lessons learned program.
The \dword{qa} plan
defines the \dword{qa} roles and responsibilities of the \dword{dune}
project. The \dword{dune} consortium leaders are responsible for identifying the
resources to ensure that their team members are adequately trained and
qualified to perform their assigned work.
All consortium members are responsible for the quality of the work that
they do and for using guidance and assistance that is available. All
have the authority to stop work and report adverse conditions that
affect quality of \dword{dune} products to their respective
\dword{dune} consortium leader and the \dword{lbnf-dune}
\dword{qa} manager.
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
\section{Environment, Safety, and Health}
\label{sec:es-tc-eshq}
\dword{lbnf-dune} is committed to protecting the health and safety of
staff, the community, and the environment, as stated in the
\dword{lbnf-dune} integrated \dword{esh} plan~\cite{bib:docdb291}.
The \dword{lbnf-dune} \dword{esh} program complies with applicable
standards and local, state, federal, and international legal
requirements through the \dword{fnal} Work Smart set of standards and the
contract between \dword{fra} and the \dword{doe}
Office of Science (FRA-DOE). \dword{fnal}, as the host laboratory,
established the \dword{sdsd} to provide facility support.
\dword{sdsd} is responsible for support of \dword{lbnf-dune}
operations at \dword{surf}.
The \dword{tcoord} and \dword{ipd} have responsibility for
implementation of the \dword{dune} \dword{esh} program for the construction and installation activities, respectively. The
\dword{lbnf-dune} \dword{esh} manager reports to the
\dword{tcoord} and \dword{ipd} and is responsible for providing
\dword{esh} support and oversight for development and implementation of the
\dword{lbnf-dune} \dword{esh} program.
The \dword{dune} \dword{esh} coordinator reports to the
\dword{lbnf-dune} \dword{esh} manager and has primary responsibility
for \dword{esh} support and oversight of the \dword{dune} \dword{esh}
program for activities at collaborating institutions. The far and near site
\dword{esh} coordinators are responsible for providing daily field support and
oversight for all installation activities at the \dword{surf}
and \dword{fnal} sites.
The \dword{lbnf-dune} \dword{esh} plan defines the \dword{esh}
requirements applicable to installation activities at the \dword{surf}
site. A key element of an effective \dword{esh} program is the hazard
identification process. Hazard identification allows production of a
list of hazards within a facility, so these hazards can be screened
and managed through a suitable set of controls. All work activities
are subject to work planning and \dword{ha}.
All work planning documentation is reviewed and
approved by the \dword{dune} \dword{esh} coordinator and the \dword{dune}
\dword{irr} or \dword{orr} committees prior to the start of work activities.
A Safety Data Sheet (SDS) will be available for all chemicals and
hazardous materials that are used on-site. All chemicals and hazardous
materials brought to the \dword{surf} site must be reviewed and approved by the
\dword{dune} \dword{esh} coordinator and the \dword{surf} \dword{esh}
department before arriving at the site.
\dword{sdsta} will maintain an emergency response incident command
system and an emergency response team (\dword{ert}) on all shifts that can access the
underground sites with normal surface fire department response
times. This team provides multiple response capabilities for both
surface and underground emergencies.
Fire and life safety requirements for \dword{lbnf-dune} areas were
analyzed in the \dword{lbnf-dune} Far Site Fire and Life Safety
Assessment. All caverns will be equipped with
fire detection and suppression systems, with both visual and audible
notification. All fire alarms and system supervisory signals will be
monitored in the \dword{surf} Incident Command Center. The
\dword{surf} \dword{ert} will respond with additional support from the
Lead and Deadwood Fire Departments and the county's emergency management
department. The caverns will be equipped with
an \dword{odh} monitoring and alarm system, with independent visual and
audible notification systems.
All workers on the \dword{dune} project have the
authority to stop work in any situation that presents an imminent
threat to safety, health, or the environment. Work may not resume
until the circumstances are investigated and the deficiencies corrected,
including the concurrence of the \dword{dune} \dword{ipd}
and \dword{lbnf-dune} \dword{esh} manager.