You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I only selected range of dates (2023-02-07 to 2023-04-07) and Gemviz consistently displayed range of was up to 2023-04-15. This was resent after I also used selection for Plan. After that it started to work fine, but looks like the number of runs in selected date range - ~50k - overwhelmed something inside. It may be necessary to limit number of runs downloaded at any given time to something sensible. Selection works with smaller number of runs. I tested 9 days of operations (~9k runs) and behavior was much better.
The text was updated successfully, but these errors were encountered:
I only selected range of dates (2023-02-07 to 2023-04-07) and Gemviz consistently displayed range of was up to 2023-04-15. This was resent after I also used selection for Plan. After that it started to work fine, but looks like the number of runs in selected date range - ~50k - overwhelmed something inside. It may be necessary to limit number of runs downloaded at any given time to something sensible. Selection works with smaller number of runs. I tested 9 days of operations (~9k runs) and behavior was much better.
The text was updated successfully, but these errors were encountered: