You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Hi, Would like to capture the the date of the spend as part "azure-cost costByResource -s " csv export.
While this is possible with individual date export, not having the date is causing bit of an issue in analysis.
Appreciate if there is method added to include the date as one additional item against each line of spend.
Thanks
The text was updated successfully, but these errors were encountered:
Hi, Would like to capture the the date of the spend as part "azure-cost costByResource -s " csv export.
While this is possible with individual date export, not having the date is causing bit of an issue in analysis.
Appreciate if there is method added to include the date as one additional item against each line of spend.
Thanks
The text was updated successfully, but these errors were encountered: